top of page
This design-build project featured a filtration system situated along the Atlantic shoreline. The owners requested a significant slide and numerous custom features. The 35′-high, 265′-long slide, complete with multiple surface elements, was engineered to withstand winds exceeding 135 mph. Its durability was proven two years later when the project endured four hurricanes, including a direct hit on Florida’s Space Coast.
bottom of page


